Busy, busy, busy. So I started the day putting the insulation above the ceiling, then fitted some of the attic floor.
Then I spent some good time running in the power feeds from the Distribution board to the office location. I ran two 2.5mm T&E for the power ring main, and a single 1.5mm T&E for the lighting. There are spare MCBs to service these needs in the board.
Then it was on with the stud partition wall construction. I would say I have 80% of the frame done now. Tomorrow I should finish it and can start cladding the garage side with Sterling board.
In a first for this site, here is a video.