Day: April 6, 2019

Office 7

Busy, busy, busy. So I started the day putting the insulation above the ceiling, then fitted some of the attic floor. Then I spent some good time running in the power feeds from the Distribution board to the office location. I ran two 2.5mm T&E for the power ring main, and a single 1.5mm T&E […]