Duck Tales – Back to plan
The set back with the floor has now been rectified. I bought about 30 M2 of Chopped, Stranded Mat (CSM) Fibreglass, and using plenty of resin I have relayed the floor. This time it is “Spotty Dog”! With the final layer of glass in and the seat bolt positions opened up, the job looked much […]